MRPeasy Manufacturing Podcast

Production planning: forward or backward scheduling?

April 15, 2020

Is production order going to be filled as soon as possible? Or is it going to be filled just in time for delivery?

The former is called forward scheduling, where the first available time slot is assigned for production. The latter is called backward scheduling or just-in-time manufacturing.

Listen more from this episode or read it from here.

Podbean App

Play this podcast on Podbean App